How many feet above the highest known flood level must the floor grade of the well pump house be?

Disable ads (and more) with a membership for a one time $4.99 payment

Prepare for the Minnesota Class D Water Operator Certification Exam with customized quizzes featuring flashcards and multiple-choice questions. Test your knowledge with detailed explanations and hints. Get exam-ready!

The correct answer is that the floor grade of the well pump house must be at least 1 foot above the highest known flood level. This requirement is essential for protecting the well and its associated equipment from potential flood damage. When the pump house is situated above the flood level, it minimizes the risk of contamination and ensures the operation remains unaffected during flood conditions. Floodwaters can carry pollutants and debris, which could compromise the integrity of the water supply if the well is inundated.

Maintaining this distance helps to create a safeguard against such issues, thereby ensuring the safety and reliability of the water supply system. Proper elevation is a critical component of well construction practices and adheres to regulations designed to protect public health and drinking water quality.